The Jan Juc Pavilion
Two storeys, one long pavilion, spotted gum above the dune.
Saltwork builds twelve to fifteen custom homes a year. Knock-down rebuilds, acreage and houses that sit low in the dune, worked out with your architect and priced before you sign.
Most the contract lets us ask for at each stage, as a share of the price
How we build
We cut to your design level from the survey peg, set footings and piers to the engineer’s drawings, lay plumbing and the termite barrier, then pour. The surveyor inspects before the pour.
Wall frames, floor structure, roof framing and bracing go up in days, not weeks. This is the last chance to move a window without a variation. Frame inspection follows.
Steel roof, glazing, external doors and spotted gum cladding. The house is weathertight and lockable, and the interior stays dry from here.
Linings, cabinetry, tiling, painting, decking and the screen. Electrical and plumbing fit-off. The longest stage, and where the finish is made.
Final inspection, occupancy permit, a defects walk with you and the keys. The last 15% is only due when we hand over.
Maximum progress payments under the Domestic Building Contracts Act 1995 (Vic), contract to build all stages. Weeks are for a home of about 280 m², after permits.
Homes
Drawn from our as-built sets. Hover a home to see its plan. Tick “Add to my brief” on any you like and we’ll start from there.
Showing all 9 homes
Two storeys, one long pavilion, spotted gum above the dune.
Single storey, steel and fibre-cement, built to BAL-40.
A long barn-line house facing the Anglesea River valley.
A 1960s fibro cottage out, a two-storey family home in.
Two 138 m² homes on one block, one party wall.
A butterfly roof catching rain and the Southern Ocean.
A brick veneer replaced by a passive-solar single storey.
Five bedrooms, a long verandah and a 40 kL tank.
A holiday home and a granny flat under one skillion.
Bells Beach · public domain photo
Southerlies off Bass Strait, salt on every surface and, behind the ridge, fire. We design for all three before we talk about finishes.
Budget
Set the home you have in mind. You get a range, a rate per square metre and the progress payments, stage by stage. An estimate to start the conversation, not a quote.
Estimated build cost, incl. GST
$1.60m to $1.90m
About $5,900 per m², middle of range
| Stage | Max. | Middle | Range |
|---|---|---|---|
| Total | 100% |
Includes GST, siteworks, standard service connections and 7-star energy compliance. Excludes land, architect and engineer fees, landscaping and window furnishings. Deposit is limited separately by law and set out in your contract.
Studio
A small team on purpose. The builder signs the contract, the supervisor is on site every working day, and the estimator prices every line you see in the tender.
Builder and director
Frames his own sites and signs every contract. Eighteen years building between Anglesea and Point Lonsdale, the last nine under his own name.
Registered Building Practitioner DB-U 00000 (demo)
Site supervisor
On site from the pour to the final clean. She runs the inspections, the trades and your fortnightly walk-through, and she’s the number you’ll ring.
Carpenter by trade. First aid and working-at-heights current.
Estimator and contracts
Prices every tender line by line, keeps provisional sums honest and writes the progress-payment schedule so you can see what is due, and when.
Quantity surveying degree. Ten years in domestic tendering.
Before the contract
You never sign a contract for a house we haven’t priced from drawings. Each step ends with a decision that is yours.
We walk the block with you. Fall, wind, view, neighbours and the overlays that apply. About 90 minutes.
Planning overlays, a BAL assessment, survey and soil, and a first cost plan against your budget.
Bring yours or meet ours. We price as the drawings develop, so the number never jumps at the end.
A fixed-price, itemised tender. Provisional sums are shown separately and explained in writing.
A major domestic building contract with the price, the stage payments, the insurance certificate and the plans attached.
In Victoria a builder must be registered with the Building and Plumbing Commission (BPC) to carry out domestic building work worth more than $10,000. Domestic building insurance is required on contracts over $16,000. Ask any builder to show you both.
Start a brief
A few lines is enough. Rowan reads every brief himself and replies within two business days, usually with a time for a site visit.
Prefer to talk?(03) 5550 4410In a live build this would go straight to Rowan, with your estimate and the homes you picked attached. Nothing has been sent from this demo.